Governance
HubXero leads MainSDK through 1.0 with public RFCs and a public roadmap; the open contracts then move to a neutral foundation.
Planned for 0.5
Status Status is where the work is: Planned (in a milestone, not started), Building (tickets in progress), Preview (usable, may change), then the stability it ships at.
Stability The promise an interface ships with.
- Stable Follows semantic versioning; breaking changes need a new major, 12 months of overlap and a codemod.
- Beta Usable in production; may change before it becomes stable.
- Experimental May change or go away; needs an explicit opt-in in main.yaml.
HubXero leads MainSDK through 1.0. Decisions that change a contract go through a public RFC, the roadmap is public, and the code is Apache-2.0 with contributions under DCO sign-off. After 1.0 the open contracts move to a neutral foundation. The full text is in GOVERNANCE.md.
Was this page helpful?